Help Sitemap Home Skip Navigation Contact Us Disability Statement

 
 
Sunday, 20th July 2008

Premium Article !

Your account has been frozen. For your available options click the below button.

Options

Premium Article !

To read this article in full you must have registered and have a Premium Content Subscription with the Edinburgh Evening News site.

Subscribe

Registered Article !

To read this article in full you must be registered with the site.

Poles at the parliament losing shine



Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image
Click on thumbnail to view image

THE shine is starting to wear off the Scottish Parliament four years after its official opening.
The coating on oak poles on the canopy over the public entrance is now nearing the end of its life.

Two sections of the canopy have been temporarily removed to test treatments with longer life-spans.

But officials insisted there was nothing to substantiate claims in a construction industry magazine that as many as 1000 oak poles may have to be taken down.

The magazine, Building, quoted an unnamed source as saying: "The desperate rush to get the parliament open before the work was properly finished means we have a never-ending snagging list."

Officials said the current life of the coating on the canopy was three to four years.

A parliament spokesman said: "We are considering carrying out work to extend the maintenance life of the resin coatings on the oak lattices in the public entrance canopy.

"This would involve removing sections of the canopy then stripping, sanding and recoating the wood.

"The purpose of this approach would be to extend the maintenance life of the coating."





The full article contains 190 words and appears in Edinburgh Evening News newspaper.
Page 1 of 1

 
1

subrosa,

17/05/2008 11:39:06
The poles look ridiculous. They shan't be missed.
2

CB,

Somewhere in the EU 17/05/2008 12:13:58
This story is about as interesting as watching a resin coating dry.
3

Auld Twa,

Edinburgh 17/05/2008 12:25:01
Let's do something about that awful frontage now. It looks as though the builders had left a number of scaffolding poles lying around after they finished the building work.
4

alex paterson,

At the moment in Sevilla 17/05/2008 14:00:10
Rip them all of and start again,try using a non rust metal,oh with a different design,properly.
5

Whiskey,

17/05/2008 14:46:48
The Scottish parliament building is listed in the dictionary under ugly.
6

Cynicaltalk,

17/05/2008 14:49:22

No doubt they will put the job out to tender, get a ridiculous quote from some guy in Kathmandu with a wooden ladder and a chamois, and decide to go with it.

That is the calibre of tube that inhabits scottish government.
7

,

17/05/2008 15:10:38
Comment Removed By Administrator
Reason:
8

Grumpy,

17/05/2008 15:25:53
Always trying to blame the poles - you'll be saying they're stealing our jobs next...............
9

alex paterson,

At the moment in Sevilla 17/05/2008 15:43:36
#7
Boy were they wrong.
10

Dragonlord,

17/05/2008 15:44:49
5#That is a terible thing to say. To put ugly and the parlament building in the same sentence is a disgrace.

What has ugly done to deserve such a thing?
11

Nikostratos,

17/05/2008 15:52:07
If you want a shiny poll just stick it out and rub furiously with both hands Should do the trick...Ooer
12

Jwil,

17/05/2008 16:24:14
How come Victorian buildings can look as good as the day they were constructed and the Parliament building is already needing major maintenance?



13

WJohn,

Wonderland 17/05/2008 18:20:30
Wonder if it will become a new metaphor / simile for an endless task now that the Forth Rail Bridge is good for another few decades.
14

Moder8,

EDINBURGH 17/05/2008 18:59:23
When they are removed, leave them down. They add nothing to the facade and will need revarnishing, at great expense, every 5 to 6 years.
Has anyone got a breakdown on the maintenance costs of the Parly?
15

Dunaskin,

Edinburgh 17/05/2008 20:04:54
Can't we get some of our (much maligned) Polish friends to fix it on the cheap?
16

Mr Fuzzy,

Edinburgh 17/05/2008 20:46:40
#12
Because they were built using traditional materials that have been used for at least 150 years (stone and slate tiles). Roofs were sloping to make sure the rain water ran off.
17

Rv2!,

18/05/2008 16:30:09
I know why they made the place bomb proof. It was stop stop those with any form of artistic ideas blowing the place up to get rid of it.

Anyway, these wood treated immigrants should be sent back as I'm sure failure in under 10 years should render them illegal.

Also good to see we are making large and EXPENSIVE structures to such exacting standards that the only start to need major structural repair every 3-5 years.
Oh hang on, my kids Wendy house has lasted that long in the garden.
18

Lance Boyle,

Linlithgow 20/05/2008 10:37:28
It is time to disband this white elephant.
19

Yanos,

Musselburgh 20/05/2008 13:44:29
Lets hope they get rid of the sh*tty crowd control barriers that have been sticking out of the 'water features' for years at the same time. No doubt they'll need planning permission/bribes to make that happen, after all, we wouldn't want to do anything positive without a painful process first would we?!

 

Comment on this Story

 

In order to post comments you must Register or Sign In

 
 
 
  

 
 

Featured Advertising



Sister Newspapers:
Press Complaints Commission

This website and its associated newspaper adheres to the Press Complaints Commission’s Code of Practice. If you have a complaint about editorial content which relates to inaccuracy or intrusion, then contact the Editor by clicking here.

If you remain dissatisfied with the response provided then you can contact the PCC by clicking here.